As a result of the Fukushima nuclear disaster, NISA is now requiring electric utility companies in Japan operating nuclear power plants to install two backup generators for each reactor instead of one as currently required.
Nuclear power plant operating companies have already moved to ensure backup in depth for power and cooling at Japanese nuclear power plants.

Be the first to comment