TEPCO Press Release (Mar 12,2011)
Plant Status of Fukushima Daini Nuclear Power Station as of 1PM March 12th (11:00:00 p.m. Friday March 11 Eastern Time)
 
Unit 1 (shut down at 2:48PM on March 11th)

– At 5:22AM, the temperature of the suppression chamber exceeded 100
degrees. As the reactor pressure suppression function was lost, at 5:22AM,
it was determined that a specific incident stipulated in article 15,
clause 1 has occurred.
– We decided to prepare implementing measures to reduce the pressure of
the reactor containment vessel (partial discharge of air containing
radioactive materials) in order to fully secure safety. This preparation
work started at around 9:43am.

Unit 2 (shut down at 2:48PM on March 11th)

– At 5:22AM, the temperature of the suppression chamber exceeded 100
degrees. As the reactor pressure suppression function was lost, at 5:22AM,
it was determined that a specific incident stipulated in article 15,
clause 1 has occurred.
– We decided to prepare implementing measures to reduce the pressure of
the reactor containment vessel (partial discharge of air containing
radioactive materials) in order to fully secure safety. This preparation
work commenced at around 10:33AM and completed at 10:58AM.

Unit 4 (shut down at 2:48PM on March 11th)

At 6:07AM, the temperature of the suppression chamber exceeded 100
degrees. As the reactor pressure suppression function was lost,
at 6:07AM, it was determined that a specific incident stipulated in
article 15,clause 1 has occurred.
– We decided to prepare implementing measures to reduce the pressure of
the reactor containment vessel (partial discharge of air containing
radioactive materials) in order to fully secure safety. This preparation
work commenced at around 11:44AM and completed at 11:52AM.

Indication from monitoring posts installed at the site boundary did not
show any difference from ordinary level.
No radiation impact to the external environment has been confirmed. We
will continue to monitor in detail the possibility of radioactive material
being discharged from exhaust stack or discharge canal

Geoff Zeiss

Geoff Zeiss

Geoff Zeiss has more than 20 years experience in the geospatial software industry and 15 years experience developing enterprise geospatial solutions for the utilities, communications, and public works industries. His particular interests include the convergence of BIM, CAD, geospatial, and 3D. In recognition of his efforts to evangelize geospatial in vertical industries such as utilities and construction, Geoff received the Geospatial Ambassador Award at Geospatial World Forum 2014. Currently Geoff is Principal at Between the Poles, a thought leadership consulting firm. From 2001 to 2012 Geoff was Director of Utility Industry Program at Autodesk Inc, where he was responsible for thought leadership for the utility industry program. From 1999 to 2001 he was Director of Enterprise Software Development at Autodesk. He received one of ten annual global technology awards in 2004 from Oracle Corporation for technical innovation and leadership in the use of Oracle. Prior to Autodesk Geoff was Director of Product Development at VISION* Solutions. VISION* Solutions is credited with pioneering relational spatial data management, CAD/GIS integration, and long transactions (data versioning) in the utility, communications, and public works industries. Geoff is a frequent speaker at geospatial and utility events around the world including Geospatial World Forum, Where 2.0, MundoGeo Connect (Brazil), Middle East Spatial Geospatial Forum, India Geospatial Forum, Location Intelligence, Asia Geospatial Forum, and GITA events in US, Japan and Australia. Geoff received Speaker Excellence Awards at GITA 2007-2009.

View article by Geoff Zeiss

Be the first to comment

Leave a Reply

Your email address will not be published.


*