Fukushima Daiichi: Highly radioactive water confirmed in trench near Unit 2
Unit 2 WNN confirms that rates of up to 1000 mSv/hr has been detected in a trench for power cables and pipes near Unit 2’s turbine building. The concrete trench is 76 metres long, four metres […]
